An interview-inspired guide featuring insights from Simon Lipson, Founder of JRSL Interiors
When planning the renovation of a luxury home in London, one of the first questions homeowners ask is: "How long is this actually going to take?"
The answer is often longer than expected.
In an era where many aspects of life are designed for speed, high-end decorating remains a craft that cannot be rushed. Whether you're renovating a Victorian townhouse in Chelsea, a Georgian property in Kensington or a contemporary penthouse overlooking the Thames, achieving an exceptional finish requires careful planning, coordination and patience.
According to research on the UK home improvement market, homeowners are increasingly choosing to improve rather than move, with interior decorating remaining one of the most popular renovation projects.
To understand what really influences decorating timelines in luxury homes, we spoke with Simon Lipson, founder of JRSL Interiors, a specialist painting and decorating company working on some of London's most prestigious residential properties.
We began by asking Simon about the biggest misconception homeowners have regarding decorating schedules.
"Most people think painting starts when the decorators arrive," Simon explains. "In reality, the painting is often the final stage of a much longer process."
Luxury decorating projects typically form part of wider renovations involving builders, electricians, plumbers, joiners, flooring specialists and interior designers. Before any paint is applied, numerous other trades must complete their work.
"The quality of the finish depends heavily on what's happened beforehand. If walls aren't perfectly prepared or other trades are still making alterations, rushing the decorating phase usually creates problems later."
This reflects a key principle in professional renovation management: decorating should be carefully sequenced alongside other trades to avoid delays, rework and damage to finished surfaces.
While every property is different, Simon outlined some realistic timelines for high-end projects.
For a beautifully finished reception room, master bedroom or study:
Typical duration: 1–2 weeks
For a luxury apartment undergoing full redecoration:
Typical duration: 3–6 weeks
For substantial London homes:
Typical duration: 8–20 weeks
"People often hear those figures and think they're excessive," Simon says. "But when you're working on a £3 million or £10 million property, expectations are extremely high. Every detail matters."
One of the most important parts of a luxury decorating project is the work that happens before any visible transformation.
Following the journalist's interview framework, we explored a common challenge that frequently extends project schedules.
Many older London properties contain decades of previous decorating work.
Layers of paint, settlement cracks, water damage and uneven plaster often remain hidden until work begins.
"It's very common to remove wallpaper or prepare walls and suddenly discover issues that weren't visible before," Simon explains.
Rather than covering imperfections, experienced decorators spend significant time correcting them.
This can include:
"When the final coat goes on, the walls look effortless. But that's because hundreds of small details have been addressed beforehand."
This attention to preparation is particularly important in expensive period properties where preserving both appearance and structural integrity is essential.
One of the biggest causes of renovation delays isn't decorating itself — it's coordination.
"A luxury renovation is like an orchestra," says Simon. "Everyone needs to come in at the right moment."
For example:
If decorators arrive too early, finished work can be damaged.
If they arrive too late, the entire project schedule can slip.
"Good decorators aren't just painters. They're project collaborators."
This ability to work seamlessly alongside other specialists is one of the defining characteristics of experienced high-end decorating teams.
We asked Simon which issues most commonly affect timelines.
Luxury homeowners often spend considerable time selecting colours, finishes and specialist materials.
"The more bespoke the finish, the more planning is required."
A hand-applied decorative finish or specialist paint system can add weeks to a programme.
Premium paints, wallpapers and specialist finishes may need to be ordered from overseas suppliers.
Many of London's finest homes are older buildings.
Unexpected discoveries such as:
can all affect schedules.
"It's very rare for a major renovation to proceed exactly as originally planned," Simon says.
Design refinements and client requests often emerge during construction.
While these changes can improve the final result, they frequently extend timelines.
One of the most valuable lessons Simon has learned during years of working on premium properties is that speed and quality rarely go together.
"The biggest mistake homeowners make is treating decorating as the easy bit at the end."
When schedules become compressed:
The result can be costly remedial work later.
By contrast, allowing sufficient time produces:
Research consistently shows that high-quality decorating enhances both aesthetic appeal and property value, particularly in the luxury market.
Simon recommends several practical steps.
Decorators can provide valuable input during planning, helping identify potential issues before work begins.
Colours, finishes and materials should ideally be selected before site work reaches the decorating phase.
Older homes almost always reveal surprises.
Allowing extra time reduces stress and helps maintain quality standards.
"Most clients forget how long the project took," Simon says. "But they live with the finish every day."
The reality is that exceptional decorating takes time.
As more UK homeowners choose to invest in improving rather than moving, expectations around quality continue to rise. Professional expertise, premium materials and careful coordination have become increasingly important elements of successful renovations.
For homeowners undertaking significant projects, the question shouldn't simply be "How quickly can this be completed?"
A better question is:
"How can we achieve the best possible result?"
In luxury decorating, the two are rarely the same thing.
As Simon concludes:
"A truly exceptional finish isn't created by working faster. It's created by doing every stage properly. That's what clients remember long after the project is finished."
If you're renovating a luxury home and would like expert advice on timelines, finishes and project planning, JRSL Interiors would be delighted to help.
Phone: 07788 516436
Email: info@jrslinteriors.co.uk
Find us on Google, Instagram, Facebook
From period townhouses to contemporary residences, JRSL Interiors delivers meticulous painting and decorating services for discerning homeowners across London. Contact us today to discuss your project and discover how professional decorating can elevate the final result.
Most high-end decorating projects take between four and sixteen weeks, depending on property size and complexity.
Luxury decorating requires extensive preparation, premium finishes and coordination with multiple specialist trades.
Common delays include design changes, hidden building issues, material lead times and trade scheduling conflicts.
Decorating should typically begin after major building works to prevent damage and maintain finish quality.
Preparation often represents over half the project timeline, including repairs, filling, sanding and priming.
Yes, period properties often require additional repairs, specialist preparation and careful preservation work.
Finalise design decisions early, appoint experienced contractors and allow contingency time for surprises.
Yes, additional preparation and craftsmanship deliver superior durability, appearance and long-term property value.